Construction

Author: 
peteratthehighline

I made a brief visit to the construction site on Saturday. The design is really starting to take shape. We are just entering that wonderful moment in a construction process when there are enough pieces in place that you can see how they all come together; and yet, like one of those biological learning tools, the guts haven't been covered up, and all the pieces are still visible.

Here's the electrical conduit running underneath the planking system.

Author: 
Anonymous
Concrete planks were delivered recently on a flatbed truck, and loaded onto the High Line at 14th Street with a crane.

Planks Delivered
 

Workers began installing the planks at Gansevoort Street, and are working their way north. These 12-foot-long, tapered planks will become the pathways on the High Line.

Planks
 

Pages

Subscribe to RSS - Construction