Crain's

highlighted mobile

Author: 
Anonymous

High Line grasses and perennials arrived onsite at 6am this morning. Friends of the High Line Deputy Director of Horticulture Melissa Fisher is working on the installation of the plants along with the High Line construction and landscape team including: SiteWorks, Kelco Landscaping, Inc., The Plant Group, planting designer Piet Oudolf, and landscape architects Field Operations.

Author: 
Anonymous
EnlargePhoto by the endlessly talented
Tim Schenck

It's ridiculously hot today. Of course, on the High Line construction site, that just means things are a little sexier than usual.

Author: 
Anonymous
  Timothy Schenck, on our engineering team, has taken some beautiful site photos throughout the construction process.

More after the jump.

 
Author: 
Patrick Hazari
Enlarge

One of the most exciting furniture pieces on the High Line will be movable chaise lounge chairs located at the Sundeck between West 14th and 15th Streets. These lounge chairs will sit on the original rail tracks, mounted on new wooden ties, and can be rolled into place or set with brakes.

Unobstructed views of the Hudson River will make this one of the most desirable areas to visit on the High Line. 

This mock-up arrived last week and is installed near the Gansevoort end.

More photos after the jump.

Author: 
Anonymous


Section 1 is very busy right now as the team prepares for a delivery of soil in a few weeks. I went up this morning to take stock of all the action happening on the Line right now. Here are some highlights. Click all photos to enlarge.

 
Tracks are being re-installed in their original locations, after being marked and stored on the Line during earlier phases of construction. Track installation is almost complete up to Little West 12th Street. Later, the areas underneath the tracks will be filled with soil, and plantings will grow up around them.

Tons more fun after the jump.

Author: 
peteratthehighline

I made a brief visit to the construction site on Saturday. The design is really starting to take shape. We are just entering that wonderful moment in a construction process when there are enough pieces in place that you can see how they all come together; and yet, like one of those biological learning tools, the guts haven't been covered up, and all the pieces are still visible.

Here's the electrical conduit running underneath the planking system.