Operations

highlighted mobile

Author: 
Erika Harvey
Categories: 


What is going on in this video?

You might think the light show is part of a public art installation or ambiance for a dance party, but this is what it looks like in the moments before a black-out on the High Line.

Managing one mile of park built on an elevated freight rail line presents unique operational challenges. Like any building in the city, the High Line has millions of dollars worth of mechanical systems – lighting and electrical infrastructure, plumbing and irrigation, and more – and it’s all connected to the city’s utility lines. When the power supply is cut nearby, it can affect the lighting system at the High Line.

Author: 
Erika Harvey
The first snowfall of the year was an opportunity to take some great photos of the High Line. Photo by Joan Garvin
 

The first winter storm arrived in New York City on Saturday, blanketing the High Line with a light coating of snow. Our maintenance and operations staff arrived before dawn to begin clearing the pathways, making the park safe for visitors to enjoy the High Line’s winter landscape.

Author: 
Auzelle Epeneter
Ice on the High LinePathways in the Chelsea Grasslands, covered in a sheet of thick ice. Photo by Friends of the High Line
 
Author: 
Auzelle Epeneter
Clearing snow from the High LineHigh Line staff began clearing the park's paths before sunrise. They worked throughout the morning until we could open to the public.
 

Author: 
admin

In addition to all the shoveling the High Line staff did to keep the park open this weekend, our temporary Maintenance & Operations facility has been moved down to the southern entrance of the High Line, at street level. In order to get ready for the joining of Section 1 to Section 2 (still under construction) the M&O trailers (where our gardeners, maintenance workers, and Rangers house equipment and offices) were moved 10 blocks south, just west of the Gansevoort Stairway.

trailerM&O container being lifted off of the 20th Street location and moved to ground level
at Gansevoort & Washington Streets. Photo by Jenny Staley.
 

The trailers and containers were crane-lifted off the High Line and loaded onto flatbed trucks that transported everything to their new southern location, where they will rest until construction for the new Whitney Museum begins at Gansevoort and Washington Street, adjacent to the High Line.

trailerContainer being set down into its new location just west of the Gansevoort Entrance.
Photo by Jenny Staley.
 
Author: 
admin

If you haven't already caught glimpses of the High Line dressed in white, check out this snow-strewn photo that our Maintenance & Operations staff took this weekend.

pipeThe Diller - von Furstenberg Sundeck under a white blanket.
 

In order to clear the snow, the crew used various tools and equipment including: a Bobcat mini-tracker with spinning broom, power brooms, push brooms, snow-blowers, shovels, and eco-friendly ice melt. Brooms (and power brooms) are the best way to remove snow safely and efficiently from the concrete planking and pathways.

Author: 
admin
pipeHigh Line Gardener Johnny Linville test-drives one of the new maintenance trikes.
 
Author: 
elizahh
Categories: 

If you visited the park in our first couple of weeks, you may have been told to enter using the Gansevoort access point. This early limited access was part of our strategy to handle the anticipated heavy crowds on the park initially.

You can now enter and exit the park at all access points (Gansevoort stairs, 14th Street stairs, 16th street stairs and elevator, 18th street stairs, and 20th street stairs).

Author: 
Anonymous
worksman tricycleWorksman Tricycle

M&O is a new series of posts attempting to explain some of the  Maintenance and Operations issues we're thinking about for the High Line once it's open. M&O discussions are ongoing, and many details will be finalized in the months leading up to the High Line's opening.

Pages

Subscribe to RSS - Operations