× !

The third section of the High Line, from 30th to 34th Streets, will be closed to park visitors from Tuesday, February 9, to Tuesday, February 23, due to an ongoing construction project. The High Line south of 30th Street will be accessible to visitors during this time.

Work Continues; Soil for Section 1 to Arrive in Early April!

Enlargeconstruction

The landscaping of the High Line is one the most exciting aspects of this project. Much has been happening on site in preparation for this part of construction. On site, resident engineer LiRo and construction management team KiSKA are working with Kelco Landscaping, Inc., the landscape contractor, and SiteWorks, a site and landscape implementation specialist, to ensure that landscaping for the High Line is installed with the highest care and attention.

The first shipment of soil is due on site at the beginning of April. Trees and shrubs will be the next to arrive on site, with plantings coming a few months from now. This layered installation process will take shape over the next six months on the High Line. Currently, a filter fabric membrane is being attached to the planking system. This is being installed to ensure that soil stays in the planting beds and prevents debris and other fine particles from entering and clogging the drainage system that runs below the planted areas. Once the filter fabric is in, soil can be brought to the site. An intricate irrigation system will be installed and distributed once all the plantings are in place. In the interim, plants will be hand-watered to ensure they properly take root and enjoy there new home on the High Line. Further down the line, other areas are starting to take shape.

Enlarge
Enlarge
EnlargePhoto credit goes here.
 
Recent Posts
Plant(s) of the Week: Bigleaf magnolia & Umbrella tree
view post
Photo(s) of the Week: Winter Sunsets
view post