× !

The third section of the High Line, from 30th to 34th Streets, will be closed to park visitors from Tuesday, February 9, to Tuesday, February 23, due to an ongoing construction project. The High Line between 30th and Gansevoort Streets will remain accessible to visitors during this time.

M&O's New Worksman Trikes!

pipe High Line Gardener Johnny Linville test-drives one of the new maintenance trikes.
 

Because of the High Line's narrow pathways and relatively long distances, it can take a member of our maintenance and operations team 30 minutes to walk from the trailers at 20th Street, down to the Gansevoort end, and back. To save time and help with heavy loads, we've just added two High Line operations trikes, from Brooklyn-based Worksman (America's oldest bicycle manufacturer), to our arsenal of operations tools. Pedal power will be a quick and environmentally friendly way to get from Point A to Point B – especially when Section 2 opens and doubles the length of the High Line.

pipe Rear View: Johnny shows off the new High Line/Parks Maintenance decal and
metal container.
 
Recent Posts
Photo of the Week: Yellow-bellied Sapsucker
view post
Throwback Thursday: Pablo Bronstein’s 'Intermezzo: Two girls wear fashion garments on a palm tree'
view post