
Construction is underway at the High Line at the Rail Yards.
Stop by the park’s northern terminus, at West 30th Street, to look through the construction fence at site preparation in progress on the third and final section of the elevated railway.
Links:
[1] http://www.thehighline.org/sites/files/images/Schenck-HLRY-2012_12_28-_DS.jpg
[2] http://www.thehighline.org/blog/2013/01/08/construction-update-sandblasting-at-the-rail-yards